Lead times and factory capacity

Free tracker. Every row is a figure already stored with a source URL and a day or a month. Last checked is that stored date. For a news item it is the publication date on the intel record, not a separate factory audit. For the Virginia Transformer capacity row it is the day that company page was read. A month is shown when the source label names a month and no day. Records with only a year, or with no date, are left off.

9 rows · 1 lead time · 8 factory capacity. Why lead times got longer is a separate guide.

Lead times (1)

What the record saysFigure in that textSourceLast checked
AP/Reuters (9 Jul 2026): US utilities and data-centre developers are competing for scarce transformers, turbines and switchgear as AI-driven load outpaces reshored supply; GSU transformer lead times passed 160 weeks in Q1 2026 (vs ~143 in 2024) and large-power-transformer waits now run 3–5 years, lifting equipment prices an expected ~4–10% over the next year — the import/allocation window for non-US suppliers with capacity stays wide open.
Intel record
160 weeks; 3–5 yearsAP / WIFC · 9 Jul 2026 [en]9 Jul 2026

Factory capacity (8)

What the record saysFigure in that textSourceLast checked
About Us states 67,000 MVA annual capacity across six facilities.
Company-reported
67000 MVA/yearVirginia Transformer Corp About Us15 Oct 2026
~6,000 MVA/yr power-transformer plant
Company development record
6,000 MVA/yrAlfaFinder · 7 Oct 2026 [en]7 Oct 2026
China: Hitachi Energy commits $300m to Hefei — a NEW power transformer factory, a NEW ultra-high-voltage bushing plant and a digital tap-changer line, inside a $9bn global programme
Company development record
$300m; $9bnTransformer Magazine / Hitachi Energy · 18 Aug 2026 [en]18 Aug 2026
Hitachi Energy building the largest US power transformer factory — $457m in South Boston, Virginia, for the AI power boom
Intel record
$457mElectrek / Utility Dive · 29 Jun 2026 [en]29 Jun 2026
Hitachi Energy inaugurates USD 70m power transformer factory and service center in Dilovası, Türkiye
Intel record
USD 70mHitachi Energy (TR) · Jun 2026 [tr]Jun 2026 (day not stated on the source label)
Hitachi Energy adds USD 150m to expand power transformer manufacturing capacity in Latin America
Intel record
USD 150mHitachi Energy (Español) · Mar 2026 [es]Mar 2026 (day not stated on the source label)
Toshiba Energy Systems & Solutions announced ~JPY 55bn of production investment in its transmission/distribution equipment business through FY2027 — about JPY 35bn on top of the ~JPY 20bn announced in July 2024 — targeting its Hamakawasaki Works (Kawasaki) and Indian subsidiary TTDI. Production capacity at both sites is to more than double by FY2030 versus FY2024. The expansion covers transformers, switchgear and arresters, citing grid renewal, renewables expansion and data-center demand.
Intel record
JPY 55bn; JPY 35bn; JPY 20bn; more than double東芝エネルギーシステムズ ニュースリリース · 17 Oct 2025 [ja]17 Oct 2025
Hitachi to invest over JPY 150bn in US, including new transformer plant for data centers
Intel record
JPY 150bn日本経済新聞 · 5 Sep 2025 [ja]5 Sep 2025