Research methodology & data integrity
TransformerPath is an independent, editorially neutral transformer-industry intelligence and engineering platform. Everything we publish is grounded in a source, tagged with a confidence and a last-verified date, and correctable on request. This page explains how.
Source hierarchy
We prefer primary, authoritative sources and treat lower-authority sources as supporting evidence that must be corroborated. The hierarchy, from strongest to weakest:
| Tier | Examples |
|---|---|
| Primary | Official manufacturer announcements, utility / operator publications, government and regulator publications, stock-exchange filings, official tenders. |
| Secondary | High-quality and industry news media, specialist trade publications, established sector analysis. |
| Supporting | Conference/event programmes, industry directories, professional-network posts (LinkedIn). Used only to corroborate, never as the sole basis for a technically or commercially important claim. |
Researched vs company-reported information
We separate two kinds of information:
Confidence
We use a three-level confidence scale โ never fake mathematical percentages. Confidence reflects source quality and corroboration for a specific fact, not a blanket rating of a company.
| Level | What it means |
|---|---|
| High | Confirmed by a primary source, or corroborated by multiple independent reliable sources. |
| Medium | Strong single-source, or partially corroborated; treat as likely but re-verify before reliance. |
| Limited | A keyword-matched or weakly sourced reference; evidence of a capability or event, not a confirmation. |
Where a system (for example a keyword-matching pipeline) automatically associates an item, it defaults to Limited confidence and is labelled accordingly โ we never upgrade a fact's confidence without a corroborating source.
Claim types & attribution
We tag how a fact is established so a reader can judge it. Key labels: INDEPENDENTLY_SOURCED, COMPANY_REPORTED, INFERRED, UNVERIFIED. A company development is displayed because it references that company; it is not presented as an independently verified award, order or project attribution unless the source explicitly confirms one.
Transformer-scope grading
Transformer-relevant projects carry a scope grade so a grid/substation project is never misread as confirmed transformer equipment. CONFIRMED = transformer equipment explicitly documented ยท INFERRED = reasonably inferred from the substation/grid scope ยท UNKNOWN = not yet documented. Inference is always shown as inference, never as confirmation.
Verified tick
A small tick appears only when a primary official source states the fact and that source was checked on a recorded date. Hover, focus, or tap the tick for Verified ยท Source: organiser site ยท checked 14 Oct 2026. The source type in that note is a link to the source URL. A secondary source, a directory listing, or a confirmed fact with no check date shows no tick and no trust label.
How we source (and what we do not claim)
Every public Intel card, directory fact and project/tender row must trace to a source URL or filing. We prefer official utility / tender-board / regulator pages, then stock filings, then corroborated trade press. Keyword hits and portal mirrors are discovery inputs โ they are graded CONFIRMED / SUPPORTED / REVIEW_REQUIRED / REJECTED before anything is eligible to publish.
Live portal adapters (DEWA, Etimad, Bahrain Tender Board and peers) stamp last_checked on every probe and last_success only when the response body is reachable and contains transformer-domain vocabulary. Session-gated or JS-only shells stay BLOCKED_AUTH / NEEDS_ADAPTER โ they are never counted as live coverage.
Intel coverage cadence
This is how often each registered source is checked. The figure is the crawl_frequency on the source registry. A source with no frequency on file is marked Not recorded. Per-country coverage (what has been published, and when it was last sourced) stays on the market pages.
Desk schedule
These are the scheduled functions in netlify.toml. They are the desk clocks, not a per-source promise.
| Function | Schedule |
|---|---|
refresh-data | 0 * * * * |
daily-rebuild | 0 6 * * * |
watchlist-alerts | 30 6,18 * * * |
Bahrain
| Source | Id | Check cadence | Last checked | Status |
|---|---|---|---|---|
| Kingdom of Bahrain Tender Board | bahrain-tender-board | Daily | 2026-10-15 | ACTIVE |
| Electricity & Water Authority (EWA) โ Central Stores Directorate | ewa-bahrain | Daily | 2026-10-15 | ACTIVE |
Kuwait
| Source | Id | Check cadence | Last checked | Status |
|---|---|---|---|---|
| Ministry of Electricity, Water & Renewable Energy (MEWRE) | mewre-kuwait | Daily | 2026-10-15 | NEEDS_ADAPTER |
| Kuwait Central Agency for Public Tenders / Central Procurement | kuwait-central-procurement | Daily | 2026-10-15 | BLOCKED_AUTH |
Oman
| Source | Id | Check cadence | Last checked | Status |
|---|---|---|---|---|
| Authority for Public Services Regulation (APSR) | apsr-oman | Twice a week | 2026-10-15 | BLOCKED_AUTH |
| Invest Oman / Ministry of Commerce, Industry and Investment Promotion | invest-oman | Twice a week | 2026-10-15 | BLOCKED_AUTH |
| Oman Electricity Transmission Company (OETC) | oetc | Twice a week | 2026-10-15 | ACTIVE |
| Nama Group | nama-group | Twice a week | 2026-10-15 | ACTIVE |
| Voltamp Energy SAOG | voltamp-oman | Weekly | Not checked | NEEDS_ADAPTER |
| Oman Observer / ONA | oman-observer | Daily | Not checked | NEEDS_ADAPTER |
| Times of Oman | times-of-oman | Weekly | Not checked | NEEDS_ADAPTER |
| The Arabian Stories | arabian-stories | Event-driven | Not checked | NEEDS_ADAPTER |
Qatar
| Source | Id | Check cadence | Last checked | Status |
|---|---|---|---|---|
| Qatar General Electricity & Water Corporation (KAHRAMAA) | kahramaa | Daily | 2026-10-15 | ACTIVE |
| Central Tender Committee / Government Procurement | qatar-tender-committee | Twice a week | Not checked | NEEDS_ADAPTER |
Saudi Arabia
| Source | Id | Check cadence | Last checked | Status |
|---|---|---|---|---|
| Etimad Government Procurement Portal | etimad | Daily | 2026-10-15 | BLOCKED_AUTH |
| Saudi Water Authority (ุงูููุฆุฉ ุงูุณุนูุฏูุฉ ููู ูุงู) | saudi-water-authority | Daily | 2026-10-15 | BLOCKED_AUTH |
| Saudi Electricity Company / Saudi Energy | sec-saudi-energy | Daily | 2026-10-15 | BLOCKED_AUTH |
| Saudi Power Procurement Company (SPPC) | sppc | Weekly | Not checked | NEEDS_ADAPTER |
| SaudiGulf Projects | saudigulf-projects | Not recorded | Not checked | โ |
United Arab Emirates
| Source | Id | Check cadence | Last checked | Status |
|---|---|---|---|---|
| Dubai Electricity & Water Authority (DEWA) | dewa-open-tenders | Daily | 2026-10-15 | ACTIVE |
| Emirates Water and Electricity Company (EWEC) | ewec | Weekly | Not checked | NEEDS_ADAPTER |
| TAQA Transmission | taqa-transmission | Weekly | Not checked | NEEDS_ADAPTER |
| Sharjah Electricity, Water and Gas Authority (SEWA) | sewa | Twice a week | Not checked | NEEDS_ADAPTER |
| Emirates News Agency (WAM) | wam | Not recorded | Not checked | โ |
Country not recorded
| Source | Id | Check cadence | Last checked | Status |
|---|---|---|---|---|
| MEED | meed | Daily | Not checked | ACTIVE |
| Zawya | zawya | Not recorded | Not checked | โ |
| Technical Review Middle East | technical-review-middle-east | Not recorded | Not checked | โ |
| Utilities Middle East | utilities-middle-east | Not recorded | Not checked | โ |
| Arabian Business | arabian-business | Not recorded | Not checked | โ |
Corrections
Every company, project, utility and intelligence page offers "suggest a correction". A correction is reviewed against a source before it is applied โ it is never auto-overwritten. Tell us the entity, the field, the current value, your proposed correction and a source/document, and the correction stays pending until reviewed.
Last verified
Each entity and fact carries a last verified date โ the last time we confirmed it against its source. Dates are shown so you can judge currency. TransformerPath data is a snapshot of published public information on that date; always carry out your own due diligence before a commercial decision.
Commercial independence
A company that pays TransformerPath (verified listing, sponsor, advertising, RFQ eligibility, enhanced presentation, logo, catalogue, contact) receives no higher research confidence, better editorial treatment, preferential Intel, fake rankings or suppressed negative factual data. Commercial products change presentation, never research integrity. Research data remains editorially independent.
Neutral institutional voice
TransformerPath maintains a neutral institutional voice. We do not name individuals in public editorial content, we do not carry unrelated company branding, and we do not rank or score companies (no "best manufacturer", no quality rating) unless a future transparent methodology justifies it.