🇨🇦 Canada Electrical Grid
Reference profile of the Canada electricity grid — grid frequency, synchronous area, and the main transmission & distribution operators with their operating voltages. Compiled from the TransformerPath worldwide grid census.
Grid operators
Related TransformerPath
Transformer-relevant projects
- Site C Clean Energy Project (500 kV transmission interconnection) · 500 kV · energized
- Chamouchouane–Bout-de-l'Île 735 kV Transmission Project · 735 kV · energized
- Romaine River Hydroelectric Complex · · energized
- Maritime Link HVDC (Nova Scotia–Newfoundland) · · energized
- Muskrat Falls Hydroelectric Project and Labrador-Island Link HVDC · · energized
- Fort McMurray West 500 kV Transmission Project · 500 kV · energized
- Alberta–British Columbia Intertie Restoration (AESO Project 7006) · · planned
- Estevan Area Transmission Lines · · construction
- Ontario Northeast Power Line (Hanmer TS–Mississagi TS) · 500 kV · planned
- Longwood to Lakeshore Transmission Line (Hydro One, 500 kV) · 500 kV · planned
Reference profile from the TransformerPath grid census; operator, voltage and frequency data are as recorded and may change. Report a correction.
Supply transformers to Canada
Submit a transformer requirement and TransformerPath will match it against the relevant manufacturing base.
Submit an RFQ Are you a supplier here? Get Verified →