Design Engineer Track
A structured pathway covering transformer-design topics typically developed over several years of engineering practice: four levels, ~400 guided hours, and five capstone design projects you self-check against published acceptance criteria — from your first 1000 kVA hand calculation to power transformers and specials. Each level now points at the matching book volumes (0–22, all coming soon) as well as the design course.
Learn
Every lesson, 3D model and calculator on this track, mapped from the TransformerPath design course and tools in the order a design office would work through them. Level 1 is free; Levels 2–4 are included with 12 months access.
Design
Each level gates on a capstone: a realistic customer specification you must design to, by hand and with the calculator, exactly like a work assignment.
Check your work Paid
Each capstone has a published model answer. Courses and capstones are not personally or manually reviewed. Completing a capstone leaves a written record on this device.
Checked sections stay on this device. When you are signed in, a published Level 1 section is also saved to your account. Levels 2–4 have no published section list, so those checks are not saved. The Skills Passport lists only saved completions. It is not a certificate.
Foundations
🏁 Capstone F — Your first complete design Model answer (paid)
Spec: 1000 kVA, 11/0.433 kV, Dyn11, ONAN, 50 Hz, Z = 5%, IEC 60076, outdoor site, 40 °C maximum ambient (IEC 60076-2 normal service conditions). Design it entirely by hand — core area and flux density, turns, conductor sizes, winding arrangement, window check — then verify against the design calculator and explain every deviation over 5%.
Acceptance criteria- EMF equation applied correctly; V/turn justified against the 0.4–0.5·√kVA rule.
- Flux density 1.55–1.70 T with the chosen CRGO grade named and its loss curve cited.
- Current density within 2.5–3.5 A/mm² (Cu) and window space factor demonstrated ≥ fit.
- Estimated no-load and load losses within ±10 % of the calculator result (a course check, not an IEC tolerance; IEC 60076-1 tolerances apply to measured vs guaranteed losses).
- One page explaining what you would change if the customer capitalized losses at $5,000/kW.
Unlock Levels 2–4 + published model answers
Distribution, Power Transformer, Specials — plus capstone projects and published model answers.
See Plans — from $199 →12 months of access. See the plan page for billing terms.
Distribution Transformer Designer
Prereq: Level 1 FoundationsThe Level 2 module list and Capstone D brief are not on this public page. They unlock with 12-month access.
See plans → Start free chaptersPower Transformer Designer
Prereq: Level 2 DistributionThe Level 3 module list and Capstone P brief are not on this public page. They unlock with 12-month access.
See plans → Start free chaptersSpecials & Mastery
Prereq: Level 3 PowerThe Level 4 module list and Capstone S brief are not on this public page. They unlock with 12-month access.
See plans → Start free chaptersLevels 2–4 and published model answers
Level 1 (Foundations) is free and public. Paid plans from $199 for 12 months unlock Levels 2–4 and the published model answers for every capstone.
See Plans — from $199 →