Big Stone South to Alexandria 345 kV Transmission Line (MISO LRTP)

A planned transformer-relevant grid/substation project, tracked as an entity (not an article) by TransformerPath.

Region North AmericaCountry USAVoltage 345 kVStatus planned
INFERRED Transformer requirement is reasonably inferred from the substation / grid scope.

Project record

ProjectBig Stone South to Alexandria 345 kV Transmission Line (MISO LRTP)
RegionNorth America
CountryUSA
Utility / buyerXcel Energy, Otter Tail Power, Great River Energy (co-developers)
Transformer requirementINFERRED
Voltage345 kV
Statusplanned
Expected

Sources

Market context

Market hub not yet built.

Last reviewed: 2026-09-01. Sources: public tender/project announcements and TransformerPath Daily Intel; transformer scope graded per the CONFIRMED / INFERRED / UNKNOWN taxonomy. Report a correction.

Supply this project

Submit a transformer requirement and TransformerPath will match it against the relevant manufacturing base.

Submit an RFQ