Blackhillock BESS (battery storage at 400 kV substation)
A Construction transformer-relevant grid/substation project, tracked as an entity (not an article) by TransformerPath.
INFERRED Transformer requirement is reasonably inferred from the substation / grid scope.
Project record
| Project | Blackhillock BESS (battery storage at 400 kV substation) |
|---|---|
| Region | Europe |
| Country | United Kingdom |
| Utility / buyer | n/a (BESS developer) |
| EPC | H&MV Engineering (electrical infrastructure) |
| Transformer requirement | INFERRED |
| Voltage | n/a |
| Status | Construction |
| Expected | — |
Sources
- World Energy · source
Market context
Last reviewed: 2026-09-01. Sources: public tender/project announcements and TransformerPath Daily Intel; transformer scope graded per the CONFIRMED / INFERRED / UNKNOWN taxonomy. Report a correction.
Supply this project
Submit a transformer requirement and TransformerPath will match it against the relevant manufacturing base.
Submit an RFQ