CTG Brasil Palmeira Wind Power Project (648 MW) com linha de transmissão 500 kV (75 km)
A Construction transformer-relevant grid/substation project, tracked as an entity (not an article) by TransformerPath.
INFERRED Transformer requirement is reasonably inferred from the substation / grid scope.
Project record
| Project | CTG Brasil Palmeira Wind Power Project (648 MW) com linha de transmissão 500 kV (75 km) |
|---|---|
| Region | Latin America |
| Country | Brazil |
| Utility / buyer | CTG Brasil (China Three Gorges) |
| Transformer requirement | INFERRED |
| Voltage | 500 kV |
| Status | Construction |
| Expected | — |
Sources
- China Three Gorges Corporation news · source
Market context
Last reviewed: 2026-09-01. Sources: public tender/project announcements and TransformerPath Daily Intel; transformer scope graded per the CONFIRMED / INFERRED / UNKNOWN taxonomy. Report a correction.