Jura line replacement (380 kV substation equipment, Bavaria)

A Construction transformer-relevant grid/substation project, tracked as an entity (not an article) by TransformerPath.

Region EuropeCountry GermanyVoltage 380 kVStatus Construction
INFERRED Transformer requirement is reasonably inferred from the substation / grid scope.

Project record

ProjectJura line replacement (380 kV substation equipment, Bavaria)
RegionEurope
CountryGermany
Utility / buyerTenneT
EPCSPIE (380 kV substation equipping)
Transformer requirementINFERRED
Voltage380 kV
StatusConstruction
Expected