La Alegría Solar (788.7 MWp + BESS 177.69 MW/314.98 MWh) con dos líneas de transmisión 400 kV (7.4 km)

A planned transformer-relevant grid/substation project, tracked as an entity (not an article) by TransformerPath.

Region North AmericaCountry MexicoVoltage 400 kVStatus planned
INFERRED Transformer requirement is reasonably inferred from the substation / grid scope.

Project record

ProjectLa Alegría Solar (788.7 MWp + BESS 177.69 MW/314.98 MWh) con dos líneas de transmisión 400 kV (7.4 km)
RegionNorth America
CountryMexico
Utility / buyerSunstone Power 2
Transformer requirementINFERRED
Voltage400 kV
Statusplanned
Expected

Sources

Market context

Market hub not yet built.

Last reviewed: 2026-09-01. Sources: public tender/project announcements and TransformerPath Daily Intel; transformer scope graded per the CONFIRMED / INFERRED / UNKNOWN taxonomy. Report a correction.

Supply this project

Submit a transformer requirement and TransformerPath will match it against the relevant manufacturing base.