Raigarh–Pugalur ±800 kV, 6000 MW HVDC system upgradation
A planned transformer-relevant grid/substation project, tracked as an entity (not an article) by TransformerPath.
INFERRED Transformer requirement is reasonably inferred from the substation / grid scope.
Project record
| Project | Raigarh–Pugalur ±800 kV, 6000 MW HVDC system upgradation |
|---|---|
| Region | Asia |
| Country | India |
| Utility / buyer | POWERGRID (PGCIL) |
| Transformer requirement | INFERRED |
| Voltage | ±800 kV HVDC |
| Status | planned |
| Expected | — |
Sources
- SRPC (regulator minutes) · source
Market context
Last reviewed: 2026-09-01. Sources: public tender/project announcements and TransformerPath Daily Intel; transformer scope graded per the CONFIRMED / INFERRED / UNKNOWN taxonomy. Report a correction.
Supply this project
Submit a transformer requirement and TransformerPath will match it against the relevant manufacturing base.
Submit an RFQ