Terra Solar (MTerra Solar) 3,500 MW project grid link (NGCP interconnection)

A planned transformer-relevant grid/substation project, tracked as an entity (not an article) by TransformerPath.

Region AsiaCountry PhilippinesVoltageStatus plannedExpected 2026
INFERRED Transformer requirement is reasonably inferred from the substation / grid scope.

Project record

ProjectTerra Solar (MTerra Solar) 3,500 MW project grid link (NGCP interconnection)
RegionAsia
CountryPhilippines
Utility / buyerTerra Solar Philippines (TSPI)
Transformer requirementINFERRED
Voltage
Statusplanned
Expected2026

Sources

Market context

Market hub not yet built.

Last reviewed: 2026-09-01. Sources: public tender/project announcements and TransformerPath Daily Intel; transformer scope graded per the CONFIRMED / INFERRED / UNKNOWN taxonomy. Report a correction.

Supply this project

Submit a transformer requirement and TransformerPath will match it against the relevant manufacturing base.

Submit an RFQ