Ultranet (2 GW HVDC, Osterath–Philippsburg)
A planned transformer-relevant grid/substation project, tracked as an entity (not an article) by TransformerPath.
INFERRED Transformer requirement is reasonably inferred from the substation / grid scope.
Project record
| Project | Ultranet (2 GW HVDC, Osterath–Philippsburg) |
|---|---|
| Region | Europe |
| Country | Germany |
| Utility / buyer | Amprion & TransnetBW |
| Transformer requirement | INFERRED |
| Voltage | HVDC (2 GW) |
| Status | planned |
| Expected | — |
Sources
Market context
Last reviewed: 2026-09-01. Sources: public tender/project announcements and TransformerPath Daily Intel; transformer scope graded per the CONFIRMED / INFERRED / UNKNOWN taxonomy. Report a correction.