🇬🇧 United Kingdom Electrical Grid
Reference profile of the United Kingdom electricity grid — grid frequency, synchronous area, and the main transmission & distribution operators with their operating voltages. Compiled from the TransformerPath worldwide grid census.
Grid operators
Related TransformerPath
Transformer-relevant projects
- Eastern Green Link 1 (EGL1, 525 kV HVDC, Torness–Hawthorn Pit) · 525 kV HVDC (2 GW) · construction
- Eastern Green Link 2 (EGL2, 525 kV HVDC, Peterhead–Drax) · 525 kV HVDC (2 GW) · construction
- Eastern Green Link 3 (EGL3, 2 GW HVDC) · HVDC (2 GW) · awarded
- Eastern Green Link 4 (EGL4, 2 GW HVDC, Fife–Norfolk) · HVDC (2 GW) · awarded
- Scotland–England Green Link (SEGL, superhighway) · HVDC · planned
- LionLink (GB–Netherlands HVDC interconnector) · HVDC · planned
- NeuConnect (1.4 GW UK–Germany HVDC interconnector) · HVDC (1.4 GW) · construction
- Viking Link (1.4 GW UK–Denmark HVDC interconnector) · HVDC (1.4 GW) · energized
- Bramford–Twinstead 400 kV reinforcement · 400 kV · planned
- Norwich–Tilbury 400 kV reinforcement · 400 kV · planned
- London Power Tunnels (400 kV underground) · 400 kV · energized
- Hinkley Point C Connection (400 kV) · 400 kV · construction
- Didcot substation upgrade (data centres & battery storage) · 400 kV · construction
- Greenlink (Wales–Ireland HVDC interconnector) · HVDC · energized
- Blackhillock BESS (battery storage at 400 kV substation) · n/a · construction
Reference profile from the TransformerPath grid census; operator, voltage and frequency data are as recorded and may change. Report a correction.
Supply transformers to United Kingdom
Submit a transformer requirement and TransformerPath will match it against the relevant manufacturing base.
Submit an RFQ Are you a supplier here? Get Verified →