🇩🇪 Germany Electrical Grid
Reference profile of the Germany electricity grid — grid frequency, synchronous area, and the main transmission & distribution operators with their operating voltages. Compiled from the TransformerPath worldwide grid census.
Grid operators
Related TransformerPath
Transformer-relevant projects
- SuedLink (525 kV HVDC corridor, North–South) · 525 kV HVDC · construction
- SuedOstLink (525 kV HVDC, Wolmirstedt–Isar) · 525 kV HVDC · construction
- A-Nord (525 kV HVDC, Heide–Polsum, Korridor B) · 525 kV HVDC (2 GW) · planned
- Rhein-Main-Link (525 kV HVDC, Wilhelmshaven–Hamm, Korridor B) · 525 kV HVDC (2 GW) · planned
- Ultranet (2 GW HVDC, Osterath–Philippsburg) · HVDC (2 GW) · planned
- Ostwind 4 (2 GW HVDC offshore grid connection, Baltic Sea) · 525 kV HVDC (2 GW) · awarded
- North Sea Connector 2 (LanWin6 + DC32, 2 GW HVDC) · HVDC (2 GW) · awarded
- DolWin6 (DolWin kappa, 900 MW HVDC offshore connection) · HVDC (900 MW) · construction
- BalWin1 & BalWin2 (2x 2 GW HVDC offshore connections, North Sea) · 525 kV HVDC (2 GW each) · planned
- BalWin4 & LanWin1 (2 GW HVDC offshore connections) · HVDC (2 GW) · planned
- Ostniedersachsenleitung (380 kV reinforcement) · 380 kV · planned
- Unterweser–Conneforde (380 kV upgrade) · 380 kV · planned
- Bommersheim–Eschborn (380 kV new line) · 380 kV · planned
- Jura line replacement (380 kV substation equipment, Bavaria) · 380 kV · construction
Reference profile from the TransformerPath grid census; operator, voltage and frequency data are as recorded and may change. Report a correction.
Supply transformers to Germany
Submit a transformer requirement and TransformerPath will match it against the relevant manufacturing base.
Submit an RFQ Are you a supplier here? Get Verified →