Wolong Electric Group
Independent company profile covering reported transformer capabilities, markets, related industry developments and relevant events.
🇨🇳 China · Shaoxing, Zhejiang · Listed · Official website ↗
Listed profiles are created from public sources. Verification confirms company identity and published profile data; it does not constitute technical certification, factory approval or commercial endorsement.
Capabilities
Related components
Relevant applications
Markets
Confirmed manufacturing facilities
Where an independent source documents a transformer manufacturing plant, it is catalogued here with its verified facility ID and source attribution. Factory capability is separate from the company group maximum and is never inferred from it.
| Shaoxing, Zhejiang, China |
Latest TransformerPath intelligence
- China XD wins CNY 4.13bn in SGCC third-batch UHV & transmission equipment tenders — 14 subsidiaries named
中国西电7月22日公告:下属14家子公司中标国家电网2026年特高压项目第三次设备招标及输变电项目第三次变电设备招标,合计约41.29亿元 — UHV packages ~CNY 2.63bn (transformers, converter valves, capacitors, breakers…
- SGCC 8th-batch UHV equipment tender: CNY 1.7bn of reactors split among 7 firms — Energy China leads with 39.4%
国网第八批特高压设备招标:电抗器约17亿元由7家企业分食 — 中国能建39.4%居首、经纬正能38.2%、特变电工18%、思源2.8%。China's UHV second-batch 2026 procurement (>CNY 20bn total) keeps rolling into ind…
- Record 820-t HVDC transformer ships from Sweden to China
Hitachi Energy's record-breaking HVDC VSC transformer leaves Sweden for the Gansu–Zhejiang UHV transmission project — global UHV demand keeps top-end …
Upcoming events
- World Power Industry Expo 2026 (Guangzhou) 16 Sept 2026 · Guangzhou, China
- wire China 2026 21 Sept 2026 · Shanghai, China
- IEEE PES ISGT Asia 2026 (Wuhan) 30 Oct 2026 · Wuhan, China
- Shenzhen Int'l Power Transmission & Control Technology Exhibition 2026 (16th) 13 Nov 2026 · Shenzhen, China
- EP Shanghai 2026 (33rd edition) 3 Dec 2026 · Shanghai, China
Last reviewed: 2026-08-28.
Claim and update this profile to keep its capabilities, markets and verification accurate.
Claim this profile →Tell us what and why, with a source where you can. Corrections are reviewed against a source before they are applied — they are never auto-overwritten.
Suggest a correction →Submit a technical requirement for supplier matching across the China and regional manufacturing base.
Submit an RFQ Compare with others →